Skip to content

Bathrooms

Bathroom Remodeling in Naperville & the Chicagoland Suburbs

The room where shortcuts show up first.

Finished bathroom remodel with a white-tiled tub and shower, matte black fixtures, a hexagon mosaic niche, matching hex-tile floor and a frameless glass panel

Bathroom Remodeling across the Chicago suburbs

A bathroom is the smallest room in the house and the least forgiving. Everything happens within a few square feet, water is involved, and a substrate mistake behind the tile will not show for two years and then will show all at once. That is why we treat waterproofing and substrate prep as the real job and the tile as the visible part of it.

We remodel hall baths, primary suites, powder rooms and basement baths — including the plumbing and venting changes that come with moving a fixture rather than replacing it in place. The bath pictured here uses a tiled tub-shower with a hexagon mosaic niche carried through to the floor and a frameless glass panel instead of a curtain.

What you get with bathrooms

  • Waterproofing you can't see

    Membrane and backer detailing at the pan, curb and niche — the difference between a ten-year bath and a thirty-year one.

  • Small-format and mosaic tile

    Hex, penny round and mosaic work needs layout planning and patience. It is finish work, and we treat it that way.

  • Aging-in-place options

    Curbless entries, blocking for future grab bars and comfort-height fixtures, if that is where the house is headed.

  • One bath, one crew, fast

    A single bath is the most disruptive small job in a house. We staff it to finish rather than leaving it half done.

Get a Free Estimate

How it runs

Our Bathroom Remodeling Process

  1. 01

    Assess what is behind the tile

    Before quoting we look at the age of the plumbing, the subfloor and the venting, because those drive the real scope.

  2. 02

    Fixture and tile selections

    Tub or curbless shower, vanity size, tile format and fixture finish get decided together — they constrain each other.

  3. 03

    Demo, plumbing and waterproofing

    Down to studs and subfloor, plumbing reworked, then backer board and a proper waterproofing membrane in wet areas.

  4. 04

    Tile, fixtures and glass

    Tile set and grouted, vanity and fixtures installed, glass measured and fitted last so it matches what was actually built.

From our work

Bathrooms we have built

See full portfolio
  • Finished bathroom remodel with a white-tiled tub and shower, matte black fixtures, a hexagon mosaic niche, matching hex-tile floor and a frameless glass panel

Get a free estimate for your bathrooms project

Tell us the town and what you want changed. We come out, look at the work, and put a written number on it — no charge and no obligation.

Text UsCall (847) 975-0476